rough-in

Pre-finish system placement

Rough-in refers to the initial stage of construction when basic infrastructure—plumbing pipes, electrical wiring, ductwork—is installed inside walls and floors before they're sealed up.

The plumber finished the rough-in before the drywall went up.

A rough-in inspection verifies this hidden work meets code before it gets covered.

The term also names the work itself: We need to schedule the electrical rough-in.

framing

studs

Structural wall timbers

backing · joists · subfloor · openings · load-bearing · partition · drywall · sheathing · plates · cripples

plumbing

pipes

Cylindrical fluid carriers

water lines · PVC · copper · fittings · valves · cleanouts · P-trap · shutoff · soldering · connections

electrical

wiring

Installed electrical conductors

circuits · cables · conduit · panel · receptacles · breakers · Romex · knockouts · grounding · inspection

construction-phase

inspection

Formal assessment of condition

utilities · infrastructure · groundwork · concealed · coordination · scheduling · walkthrough · punch list · building department · trades

HVAC

ductwork

HVAC distribution channels

plenum · trunk lines · diffusers · dampers · flue · exhaust · intake · boots · transitions · insulation

Categories
Opposites
construction phase

rough-infinish work

Complete your job duties

trim · finish · finishing · punch list · final inspection

completion state

rough-infinished

Brought to an end

complete · final · polished · refined

Family

roughing

Familiarity
Top 500,000
Profile
Used worldwide · Timeless · Concrete · Rated G