critical path

Longest necessary route

Critical path is a project management term for the sequence of tasks that determines the minimum time needed to complete a project.

Any delay along the critical path delays the entire project, while tasks off the critical path have some slack.

We need to focus resources on the critical path items.

The concept comes from network analysis methods developed in the 1950s.

scheduling

dependencies

Things required for operation

tasks · phases · duration · slack · float · lead time · lag time · predecessor · successor · network diagram

bottleneck

constraint

Limiting condition or rule

impediment · delay · single point of failure · logjam · obstruction · queue · handoff · congestion

deadline

completion date

Scheduled end point

countdown · delivery date · go-live · launch date · cutoff · slippage · on-time delivery

prioritization

high-impact

Having major effect

optimization

acceleration

Rate velocity changes

trade-offs · risk mitigation · contingency planning · resequencing · parallel processing · shortening

Categories
Opposites
project necessity

critical pathnice-to-haves

Desired but unnecessary features

stretch goals

scheduling flexibility

critical pathfloat

Buoyant object or vehicle

slack · slack time · buffer · padding

constraint level

critical pathfree float

Tradeable shares outstanding

slack time · buffer time · padding · wiggle room

Family

path, critical, critically, uncritical, hypercritical, overcritical, noncritical, criticality, criticalness

Familiarity
Top 500,000
Profile
Used worldwide · Timeless · Abstract · Rated G